Work orders
Every job, from the first report to the signature
Work orders with statuses your team names, preventive schedules that create the next job in good time, and procedures that show the work was done right.
The problem
“The PM plan lives in a spreadsheet, and the week is lost to breakdowns.”
Jobs arrive by phone, paper and chat, preventive work slips as soon as it gets busy, and afterwards nobody can say what was checked.
In Ophelm
From the plan to the sign-off
See the work the way you plan it
A list, a board by status and a calendar by week or month, for all the work, your team’s or your own. Change many work orders at once, with undo.
Preventive maintenance that keeps its rhythm
Repeat every few days, weeks, months or years, on fixed dates or counted from the last completion, for up to 200 assets in one schedule. Each work order is created ahead of its due date, as far ahead as you set.
Procedures with required steps
Thirteen step types, from checkboxes and measurements with a range to photos and signatures. Mark the steps that must be answered; a measurement out of range is saved and marked failed.
Done means done
A work order completes only once its required fields, its required procedure steps and, where the type asks for one, the signature are there. Closed work orders can be locked until someone reopens them.
Questions
Can one schedule cover several machines?
Yes. A schedule holds up to 200 assets, each with its own next due date, and creates one work order per asset each time.
Can the next service wait until the last one is done?
Yes. A schedule runs on fixed dates, or counts its interval from when the last work order was completed, in days, weeks, months or years.
What happens to a work order when its procedure changes later?
It keeps the version it was given. Procedures are published in numbered versions, and the history shows each one.
What happens when a reading is out of range?
The value is saved and the step is marked failed, so nothing is lost and the deviation shows on the work order.
Can technicians work on a phone?
Yes. Every screen fits a phone, so a technician opens today’s work order there with its procedure, parts and time.
Can we print work orders for the shop floor?
Yes. The printed sheet holds the key facts, the procedures and their answers, parts, time, costs and a sign-off block, for one work order or up to 25 at once.
See it with your own site
Sign up free, add a site and a few machines, and try it with your team.